Alares Architects & Engineers
Insights

Notes from the field.

Practical writing on healthcare, federal and commercial engineering: commissioning, sustainability, structural and the kind of operational details our clients ask us about most.

Project spotlights
Headstones in a national cemetery
August 25, 2026

Before the VA buys land, we check it

National cemeteries run out of room. Before the VA buys the land next door, somebody has to walk it and find out what is actually in the ground.

Illustrative photo of an occupied hospital ward corridor
August 18, 2026

We renovated a mental health ward around the patients

A five level addition and renovation of an inpatient mental health building that could not close, plus two code problems nobody was looking for.

Illustrative photo of a masonry hospital building facade with replacement windows
August 11, 2026

We replaced every window in the hospital

A window in a VA hospital has more jobs than a window at home. Heat, patient safety, and blast resistance, all in the same frame.

Bank of red fire sprinkler risers and zone valves at a VA campus
August 4, 2026

Fire alarm upgrades across 27 buildings

Upgrading the fire alarm systems in 27 occupied buildings at the Bedford VA, and heading off change orders before they could happen.

Labeled chilled water supply and return piping in the Asheville VA Medical Center mechanical plant
July 28, 2026

10,000 feet of chilled water pipe, replaced live

Replacing the chilled water distribution system under an occupied VA hospital, floor by floor, without a single unplanned outage.

High-pressure steam boilers inside the VA Albany central boiler plant
July 21, 2026

A 1940s boiler plant, brought into 2026

Replacing three 900 HP high-pressure steam boilers at the VA Albany campus, while the hospital kept running on steam the whole way through.

Manchester VAMC steam distribution piping
June 24, 2026

Inside the Manchester steam tunnel

Replacing steam piping inside a 500-ft confined-space tunnel under an active VA hospital, surveyed by remote camera so no one had to go in.

Mechanical systems commissioning
June 17, 2026

The plant that fought itself

On a new $18M combined heat and power plant at the Newington VA, commissioning caught a control sequence cooling its own absorption chillers.

Geothermal steam venting from arid terrain
June 10, 2026

Drilling 2,200 feet to prove geothermal

A 2,200-ft test well and a full NEPA environmental assessment to a FONSI confirmed direct-use geothermal heating was feasible for the Reno VA.

Mechanical ductwork and HVAC distribution
June 3, 2026

Retrocommissioning 11 VA campuses

Across 11 VA hospital campuses and 10.5M sq ft, retrocommissioning found 15 to 20 percent energy savings with no capital project.

Field notes
The Alares emblem: a wing drawn in three stacked layers of blue
August 27, 2026

Three layers. One wing

People ask about the logo, so here is the answer. What the mark is, where it came from, and the commitment behind it.

Existing plant piping and equipment documented before design at the VA Albany boiler plant
August 20, 2026

We measure first. Then we design

The drawings on file rarely match what is in the field. Scanning and modeling the real conditions first is what keeps bids accurate and change orders rare.

Illustration of structural steel bracing and seismically supported piping in a central plant
August 13, 2026

The boiler plant has to survive an earthquake

For a hospital central plant the standard is not stay standing, it is keep working. What that actually takes on a building framed decades before the code.

Aerial view of rooftop solar panels on a VA campus building
August 6, 2026

What net zero actually means on a federal campus

Net zero is a balance between the energy a campus uses and the energy it makes. Here is what that looks like in practice, on three real VA projects.

Mechanical plant equipment and distribution serving a VA healthcare campus
July 30, 2026

Your building is probably wasting 15% of its energy

The equipment is usually fine. It is just running settings nobody has revisited in years, and that gap is worth 15 to 20 percent of your energy bill.

The Alares team
July 23, 2026

Eight disciplines, one accountable team

Architecture, MEP, structural, owner's rep, commissioning, sustainability, environmental and energy consulting, under one roof and one point of accountability.

Engineer performing functional testing in the field
May 7, 2026

Commissioning is not a formality

Commissioning isn't a regulatory checkbox. On a VA power plant it caught a control sequence fighting itself, the case for Cx in one example.

Wetland and marsh landscape
April 16, 2026

NEPA in plain English

What NEPA requires, what a Finding of No Significant Impact means, and how Alares carries federal projects from assessment to a green light.

Owner's representative reviewing progress with the project team on site
April 9, 2026

Who is protecting your side of the build?

They sound interchangeable. They are not. The difference is whose side the manager is on, and on a hospital campus that shows up in the details.

Healthcare clinical space
April 2, 2026

Healthcare design that ages well

Hospital design must serve patients for decades and work the day after handover. What designing for the long haul looks like on real VA projects.

Have a question we should write about?

If you've got a problem you keep running into on hospital, federal or commercial work, drop us a line. It might be the next post.

Headquarters

1990 Main St Downtown,
Suite 750
Sarasota, FL 34236

941.444.0477
Boston Office

248 Copeland Street
Quincy, MA 02169

617.481.6390