Why commissioning pays for itself.

Most facility managers we talk to think of commissioning as a regulatory checkbox, something the spec calls for at the end of a project, signed off and forgotten. It's not. Done right, it's the single most reliable way to make sure your building actually does what its design says it will.

Air handler commissioning
Topic

Commissioning

Read time

4 minutes

Published

May 7, 2026

Audience

Facility managers · Owners

What commissioning actually does

Commissioning (Cx) is a third-party verification process. We test systems (air handlers, chillers, controls, switchgear, fire alarm) under real operating conditions, against the design intent, and document where they fall short. Then we work with the contractor to fix it before the warranty period expires.

That's it. No magic. The leverage is in the rigor.

A real example: the plant that fought itself

Alares served as construction manager and commissioning agent for a new combined heat and power (CHP) plant at the Newington VA Medical Center in Connecticut, a roughly $18M plant with three generators, an absorption chiller and a cooling tower tied into the existing campus chilled water system.

During functional testing, our team found that the control sequence for the chillers wasn't working the way the drawings said it should. The hot water loop feeding the existing building heat exchanger was actually cooling the hot water meant to drive the absorption chillers, the plant was quietly working against itself. We recommended a revised control sequence, the controls were reprogrammed, and the fix was incorporated into the project.

Nobody would have caught that from a set of as-builts. You catch it by testing the system under load, which is exactly what commissioning is.

Three places it earns its keep

1. Catching design-vs.-reality gaps before occupancy

Almost every project has at least one system that comes in working "kind of", fans set to the wrong CFM, dampers stuck open, sequences of operation that look fine on paper but fight each other in the field. Commissioning surfaces these while the contractor is still on the hook. After substantial completion, the same fixes become change orders.

2. Verifying critical infrastructure, not just comfort systems

Commissioning isn't only about HVAC. On the campus electrical distribution upgrade at the Baltimore VAMC, Alares commissioned the main transformers, switchgear, automatic transfer switches and distribution panels, the equipment a hospital cannot afford to have fail, all verified against the VA Whole Building Commissioning Process Manual through documentation, startup, calibration, performance testing and training.

3. Documentation operations can actually use

Most as-built drawings rot in a binder. Commissioning produces something different: a verified record of how every system was set up, what the sequences are, and what to do when something drifts. Two years later, when something breaks at six in the morning, that document is what saves the call-back.

What about retrocommissioning?

If your building is more than ten years old and has never been formally commissioned, retrocommissioning typically pays back fast. Across 11 VA hospital campuses in VISN 1 (New England), Alares retrocommissioned more than 10.5 million square feet of healthcare space and identified energy savings of 15 to 20 percent, by tuning existing systems, not replacing them.

Bottom line

If you're planning a new build, commission it. If you've inherited an aging facility, retrocommission it. The work pays for itself, and what you learn carries forward to every operating decision after.

Need a commissioning agent?

Whole-building, HVAC, electrical, CHP and retrocommissioning, from single air handlers to multi-campus VA portfolios.