We renovated a judge’s chambers in Boston.

Most of our work is large mechanical infrastructure on hospital campuses. This one was a single room. The GSA needed a judge's chambers renovated at the John Joseph Moakley Courthouse in Boston, and Alares was lead architect on it. It is worth writing about precisely because it is small, since the process did not change.

Judge’s chambers at the Moakley Courthouse in Boston
Client

General Services Administration, Boston

Location

Moakley Courthouse, Boston, MA

Alares role

Prime and lead architect

Completed

2022

The job

The scope was a full renovation of the chambers, including the addition of a private bathroom. The existing spaces were reworked with new doors, a new ceiling and lighting, carpet, paint, millwork trim, a cased opening and wainscoting panels. Selective demolition took out the ceiling, lighting, walls and flooring that were being replaced.

Construction was estimated at roughly $297,000. By the standards of a boiler plant replacement that is a rounding error. By the standards of the person who works in that room every day, it is the whole building.

Our role

Alares was prime on the contract, providing architecture, interior design, mechanical and structural work, and cost estimating. New England Engineering handled electrical and fire protection engineering. Our scope ran from site surveys and concept design through detailed design, bid documents and estimating.

That structure matters more than it sounds like it should. Being prime means the GSA had one firm accountable for the whole design and for managing the subconsultants, rather than coordinating them itself.

Why a small job still needs the full process

An interior renovation in an occupied federal courthouse is not a simple job just because it is a small one. The building is in use. The finishes have to match a specific existing character rather than a catalog. New mechanical and electrical work has to tie into systems that are already there, and the fire protection has to stay compliant while walls come out and go back in.

Skip the site survey on a job like this and you find out during construction what was actually behind the wall. Skip the cost estimating and the bids come back over budget. The process exists because the surprises are the same size regardless of the contract value.

The point

Not every project is a boiler plant. This one was carpet, paint, wainscoting and a bathroom, and it got site surveys, a full design, coordinated subconsultants and an independent cost estimate, because a room somebody works in every day is worth getting right.

Renovating an occupied federal building?

Architecture, interior design, MEP coordination and cost estimating for courthouses, offices and other federal spaces that stay in use while the work happens.

Headquarters

1990 Main St Downtown,
Suite 750
Sarasota, FL 34236

941.444.0477
Boston Office

248 Copeland Street
Quincy, MA 02169

617.481.6390