In most buildings, a broken chiller means a hot afternoon and an annoyed tenant. In a hospital it means operating rooms, imaging and pharmacy losing the conditions they depend on. That difference is why hospital systems are designed around redundancy, and why it shows up in almost every project we do.

Blue Alares graphic reading: Why hospitals build two of everything.
Topic

Healthcare engineering

Audience

Facility managers · Owners

Published

October 28, 2026

Read time

3 minutes

The idea

Equipment fails. Chillers trip, pumps wear out, boilers need maintenance, the utility grid goes down in a storm. A hospital cannot choose when those things happen, and it cannot close while they are fixed. So the systems are designed to keep working with a piece missing.

What N+1 means

The common term is N+1. N is the amount of equipment needed to carry the full load. The plus one is a spare. If the cooling load needs two chillers, an N+1 plant has three, so any one of them can be out of service and the building still gets what it needs.

Some systems go further, with full duplicate capacity or separate paths. The right level depends on what the system serves and what happens if it stops.

Where it shows up

Cooling

At the Manchester VA we designed a fully redundant chilled water system for the main medical center, so one chiller can fail without the building losing cooling.

Power

Hospitals carry emergency generators that pick up critical loads when utility power drops. At Albany, the boiler plant work added a new backup generator so the plant that supplies the campus steam keeps running through an outage.

Heat and steam

Central plants are usually built with more boiler capacity than the peak load, so a boiler can be taken down for service in the middle of winter without the campus going cold.

The cost of it

Redundancy costs more up front. More equipment, more space, more piping and controls. The return is that maintenance can happen on schedule instead of in a panic, and a failure becomes a work order instead of an emergency.

The point

Equipment will fail eventually. The hospital should not. Designing for that from the start is what lets nobody inside notice when it happens.

How much redundancy does your plant need?

Redundant chilled water, steam and emergency power design for hospitals and federal facilities that have to keep running.

Headquarters

1990 Main St,
Suite 750
Sarasota, FL 34236

941.444.0477